GEM Services

Hydro-Kinetic Turbine

Project Assessment

  • Project Costing

  • Budget Estimating

  • Project Consulting

Site Assessment

  • Energy Production 

  • River/Channel velocities measurements 

  • Site Location

Engineering Designs & Services

  • Site Securement 

  • Site Safety Measurements

  • Site Mooring/Anchoring

  • Calculating Hydro Flows

  • Calculating Hydro Kinetic Turbine Size

  • Power Output

  • Stress & Dynamic Analysis on Models with Software

  • Fluid flow Analysis Optimization with Software

  • Environmental Impacts 

Environmental Assessment

  • Wildlife Survival Including Birds & Fish

  • Low Noise Impact and Quite Operation

  • No Water Reservoir Required

  • All Components are Environmental Friendly 

Installation

  • Site Installation

  • Transportation

  • Site Assembly

Power Distribution

  •  On-shore grid

  • Off- shore grid

  • Micro grid

 GEM Culvert / GEM Storm Drain / GEM Pipeline Containment

Project Assessment

  • Project Costing

  • Budget Estimating

  • Project Consulting

Site Survey

  • Site Surveying and Assessment

Engineering Designs & Services

  • Site Installation

  • Site Safety

  • Calculating Hydro Flows

  • Calculating Culvert Sizes

  • Stress & Dynamic Analysis on Models with Software

  • Fluid Flow Analysis Optimization with Software

  • Environmental Impacts 

  • Erosion Control

  • Addresses Permafrost Concerns

Environmental Assessment

  • No Wildlife Harm (Birds & Fish)

Installation

  • Site Installation

  • Transportation of Product to Site

  • Site Assembly